SFO IST — Sandbox Walkthrough

Run the IST wizard on a project whose result is already known. IST Test Project in SFOBox has nine systems. Five Template Project ISTs apply, two systems are new, and one record is there to prove it is left out. Compare the screen with the tables below, then run the check script. Reset puts the project back so you can do it again.

SFOBox only Log in to Sandbox (SFOBox) as a user with the permission set SFO IST Access. This walkthrough does not use Terminal 3 West, and it does not change the Template Project.
The project is already loaded Program IST Test Program, project IST Test Project. Nine records, names starting with IST-TEST. No ISTs have been created on it yet. Open the project, then the Activity Lists tab, then the ISTs sub-tab.
Compare setup→ Recommended ISTs→ New system→ Create→ Check script→ Reset
Step 1

Confirm the nine records

On the project, open Systems. You should see only these records. The Template System column is the comparison. A blank Template System is a new system.

RecordTypeUnderTemplate SystemWhat it is for
IST-TEST BuildingParentBuilding SystemsHolds the others. No IST covers it.
IST-TEST Public AddressSystemIST-TEST BuildingPublic AddressDirect match.
IST-TEST Sharc UnitEquipmentIST-TEST BuildingSharc SystemDirect match.
IST-TEST SwitchgearEquipmentIST-TEST BuildingSwitchgearMatch through its parent, Electrical Power Distribution.
IST-TEST ElevatorEquipmentIST-TEST BuildingElevatorDirect match, and its parent Conveyance is on another IST.
IST-TEST Point of Use 400HzEquipmentIST-TEST Building400Hz (Point of Use)Has a template, and no IST covers that template. It must not be recommended or linked.
IST-TEST Heat RecoveryParentNew system. Generate uses this one.
IST-TEST Heat PumpEquipmentIST-TEST Heat RecoveryEquipment of the new system. It is not listed on its own as a new system.
IST-TEST WayfindingSystemSecond new system. Leave it, so you can see a system that gets no IST.

Checklists and Inspections on this project stay empty. Every list you create is an IST.

Step 2

Recommended ISTs

On the project Activity Lists → ISTs → Create ISTs.

The first step is 1. Recommended ISTs. Nothing is checked yet. Click Select all. You should see these five, in this order, and no others. IST 6.0 Ramp Operations is not here, because its template links were left unloaded.

ISTLine under the name
IST 1.0 Audio Notification2 project records · Template Systems: Electrical Power Distribution, Public Address
IST 2.0 Conveyance2 project records · Template Systems: Conveyance, Elevator, Public Address
IST 3.0 Electrical Metering, Monitoring and Control2 project records · Template Systems: Conveyance, Electrical Power Distribution
IST 4.0 Emergency Power1 project record · Template Systems: Electrical Power Distribution
IST 11.0 SHARC1 project record · Template Systems: Sharc System

None of them should say Already on this project. Click Next.

Step 3

Generate an IST for the new system

Step 2. New systems lists two records:

  • IST-TEST Heat Recovery — Parent · 1 equipment
  • IST-TEST Wayfinding — System · 0 equipment

Click Generate on IST-TEST Heat Recovery only. The wizard moves to 3. Review new ISTs. The badge says Drafted by the Citiri agent. If Einstein is unavailable it says Drafted from record links, and the test still works.

What stays the same every run

  • The first section is Prerequisites/Critical Events, with these lines: Integration Diagram Completed, SOO Review with Stakehoders, IST Script Completed, System Dependencies Completed, FPT Completed, Integration Completed, IST Scheduled.
  • Then four empty sections: SSR Rooms, AHJ Focused, Load Centers, Emergency Management.
  • IST-TEST Heat Recovery is selected. IST-TEST Heat Pump is offered and selected. Leave both selected.
  • IST-TEST Point of Use 400Hz, IST-TEST Building, and the template-linked equipment are not in this list.

What the agent may word differently

The IST name, the summary, and any sections after the four empty ones change from run to run. One sandbox run named it IST - Heat Recovery System and added a Heat Recovery System section and a Heat Pump Equipment section, with three lines each. That wording is not the answer key.

Closing throws the draft away If you close the panel before Create, the draft is discarded and Heat Recovery no longer says Drafted. Generate again. Wayfinding stays without an IST on purpose.
Step 4

Create the ISTs and compare the links

The button reads Create 6 ISTs (five from the Template Project, plus the draft). Click it. The Created list has six names. Template copies keep the template name. The new one uses the drafted name. Click each template copy and compare its IST Systems related list.

Copied ISTLinked recordsReason
IST 1.0 Audio Notification IST-TEST Public Address
IST-TEST Switchgear
Points at Template System Public Address.
Its Template System is under Electrical Power Distribution.
IST 2.0 Conveyance IST-TEST Elevator
IST-TEST Public Address
Points at Template System Elevator.
Points at Template System Public Address.
IST 3.0 Electrical Metering, Monitoring and Control IST-TEST Elevator
IST-TEST Switchgear
Its Template System is under Conveyance.
Its Template System is under Electrical Power Distribution.
IST 4.0 Emergency Power IST-TEST Switchgear Its Template System is under Electrical Power Distribution.
IST 11.0 SHARC IST-TEST Sharc Unit Points at Template System Sharc System.

Each copied list also has the same shell: one group, five sections, and seven lines in Prerequisites/Critical Events. The four other sections are empty.

These records are on none of the five copies: IST-TEST Building, IST-TEST Point of Use 400Hz, IST-TEST Heat Recovery, IST-TEST Heat Pump, IST-TEST Wayfinding. Heat Recovery and Heat Pump are on the generated IST only, with link source Generated.

On a system record

Open IST-TEST Switchgear. If the system page in this org is System Equipment Record Page 1, the Checklists tab has an ISTs list with only the IST name. You should see IST 1.0, IST 3.0, and IST 4.0. SFOBox still ships on the packaged system page, so this list is hidden until that page is activated. The IST Systems list on the Activity List is the check that works either way.

Open the wizard again. The five template ISTs now say Already on this project and cannot be checked. Heat Recovery says Already in an IST. Wayfinding does not.

Step 5

Compare with the script

From the SFO project folder, run:

sf apex run -o faizan.shaik@sfo.citiri.com.sfobox -f "docs/IST/IST Walkthrough/check_ist_test.apex"

Read the debug lines that start with CHECK. The last one is the score.

When you run itLast line
Before CreateCHECK done pass=16 fail=0 skip=1
After Create, whether or not you generatedCHECK done pass=22 fail=0 skip=0

A generated IST is reported as CHECK INFO generated. It is not part of the pass count, because the agent names it. Any CHECK FAIL means the project no longer matches this page. Run seed_ist_test.apex to repair the nine records. That script does not delete ISTs you already created.

Step 6

Put the project back

Reset deletes the IST Activity Lists on IST Test Project, their sections, lines, and links, and any generate drafts. The nine IST-TEST records stay. The Template Project stays.

sf apex run -o faizan.shaik@sfo.citiri.com.sfobox -f "docs/IST/IST Walkthrough/reset_ist_test.apex"

The debug line looks like RESET drafts=1 lists=6 nodes=... items=.... The counts depend on whether you generated. Then run the check script again. It should end with pass=16 fail=0 skip=1.

If the project itself was deleted, run docs/IST/IST Walkthrough/seed_ist_test.apex the same way. The seed checks the five recommendations before it finishes. If those no longer match, it rolls back and the debug log says which IST changed.